Engineer Maintenance – Plant

About Us
Founded in 1988, Varroc group is a global tier-1 automotive component manufacturer and supplier of exterior lighting systems, plastic and polymer components, electricals-electronics components, and precision metallic components to passenger car, commercial vehicle, two-wheeler, three-wheeler and off highway vehicle (‘OHV’) OEMs directly worldwide.With 36 world-class manufacturing facilities and 16 R&D centers in 10 countries, Varroc group is on an exponential growth trajectory clocking a sale of 1.5 billion USD in 2016-17. The company is one of the leading global passenger car lighting suppliers and amongst the top 2-wheeler automotive component supplier in India. Varroc offers best design solutions that give customers a competitive edge in their markets.
Job Description
The Description will be added by the recruiter once the MPR is approved. Please review the Job Description in the GPS link provided below. In case of any additions please add the comments on the dialog box given in the ‘Additional Information’ section of this job form. Or Directly get in touch with your BU HR SPOC. GPS Link : https://apps.powerapps.com/play/e/default-9022385e-792b-48c0-b208-6b954b4fafdc/a/82059f69-4b43-44f6-ac28-2364485db406?tenantId=9022385e-792b-48c0-b208-6b954b4fafdc&source=portal&screenColor=rgba%280%2C+176%2C+240%2C+1%29&skipAppMetadata=true
Job Requirement
1. Breakdown Maintenance
Attending      Breakdown maintenance on receipt of Breakdown slip/memo
Doing      root cause (Why Why analysis) analysis and manual check to identify      defect/abnormality.
Restoring      the defective parts & removing the abnormalities
Implementing      the counter measure to prevent occurrence of the same problem/abnormality.
Carry      out horizontally deployment of counter measure.
Preparing      for daily review meeting to discuss the maintenance issue.
Taking      machine trail and handover the machine for production.
Coordinating      with service engineers for execution of NPD & Improvement with ME Team      for machine shifting activity
Should      have departmental discussion on issues /its resolution so that it should      communicated to all concern for effective closure and no repetitions
1. Predictive/ Preventive Maintenance
Following      the prevent maintenance as per annual plan
Analyzing      the previous history of equipment before taking it for PM.
Doing      manual inspection of machine & equipment as per the Preventive      Maintenance check sheet on daily & weekly basis.
Restoring      the defective parts & removing the abnormalities & taking      corrective measures proactively.
Taking      trail of equipment to ensure normal functioning of the equipment &      handing over to production
Following      and updating TBM calendar
Inspect      the machine equipments spare parts from time to time as per TBM calendar
Verifying      the equipment and spare part as per shelf life to analysis its condition
Doing      condition-based maintenance to increase the life of the equipment &      continuous monitoring the equipment.
Maintaining      predictive maintenance/activity report
Conducting      quarterly preventive maintenance to avoid future breakdown
2. Inventory Reduction & Cost saving
Identifying      critical and non-critical spare parts
Maintaining      the inventory of spare parts as per the lead time required to procure      particular spare part.
Reducing      the inventory of parts and material by identifying and replacing with      common part instead of using different parts.
Identify      the low cost & long-life parts & materials to reduce the cost of      material and parts.
Reducing      service cost by inhouse training of employees i.e. SW & Apprentice.
Energy      saving projects
3. Spare Part Management
Ensuring      machine wise spare part availability as per the Time Base Maintenance      (TBM)
Generate      PR for procurement of required Spare part
Take      follow up with Purchase department for timely availability of spare      part
Issuing      spare part from Stores & installing the spare part
4. Documentation & other activities:
Check      Daily breakdown report & update in SAP
Maintain      documents for TS, IATF Audit
Maintaining      preventive maintenance check sheet, machine history card, updating TBM      calendar, predictive maintenance documentation
5s      Audit documentation & pre and post report
Suggesting      kaizen for improvement & implementation
Giving      training to casual labor/apprentice
Monthly MIS preperation
Analysis & PCA plan based on data

To apply for this job please visit varroc.skillate.com.

Job Overview
Job Location